Sunt articole care ma ajuta sa exemplific ce sustin si ca sa fiu
sigur ca nu dispar din locatia originala apelind la performantul instrument "copy/paste" le fixez la mine pe site.Pornind de la ele cu resursele mele limitate caut sa le adaug TVA.(fara "Taxa" mai mult "Valoare Adaugata") Ca reusesc sau nu asta este alta poveste. Sursa:intelilight.eu
inteliLIGHT®
controls over 12.000 lamps and integrates both an advanced security
systems and a revolutionary electric vehicle charging system with its
PLC installation in Brasov, ROMANIA.
Located in the central part of Romania,
Brasov is the 7th largest city in the country. First attested in the
early Middle Ages under the name Corona, Brasov has a fascinating
history with Hungarian kings, Teutonic knights, German colonists and
Hebrew merchants leaving their mark. The long, troubled history of this
old Medieval trading post enriched its culture and architecture, making
it today one of the main touristic attractions in the region, preferred
by most of the tourists visiting Romania.
The quality of street lighting,
especially in the old center, is considered critical for the city’s
touristic output. Also, personal safety and environment issues are taken
seriously by the municipality of this city, visited annually by more
than 1.000.000 tourists from all over the world
The challenge
The municipality needed to improve the
street lighting efficiency, but without changing the entire
infrastructure. The budget did not include lamp upgrades to LED or
DALI/0-10V electronic ballast. Therefore, the main project requirement
was controlling over the existing infrastructure, putting inteliLIGHT®
retrofitting capabilities to a test, as most of the 12.000 fixtures were
using HID lamps with electromagnetic ballasts. Also, due to the
significant energy losses known to exist in the grid, inteliLIGHT needed
to address energy consumption assessment within the lighting cabinet
and automatically compare with the sum of individual lamp consumption.
Together with these requirements, the
municipality was looking for solutions to implement a city-wide CCTV
system and panic buttons in order to improve public security throughout
the city.
In order to achieve the project’s
requirements, Flash Lighting Services, the company that manages the
entire street lighting infrastructure in Brasov, decided to initiate a
partnership with Flashnet and inteliLIGHT.
The argument
inteliLIGHT®’s PLC solutions offers
stable connectivity through existing power cables and extended
retrofitting capabilities. At the moment, it was one of the very few
solutions focusing on retrofitting and adapting to electromagnetic
ballasts and older lamps, rather than replacing the entire
infrastructure.
The system communicates securely over
the existing power cables, establishing a reliable and reasonably fast
connection without additional investments and civil works. Open
protocols allow inteliLIGHT CMS integration with other functionalities
besides street lighting control and the lamp-level control keeps the
grid powered up even during the day. This way, additional equipment can
be powered and managed directly through the street lighting grid even
during the day, when the legacy street lighting systems are powered
off.\
Technical solution
Main inteliLIGHT streetlight control system
- 2300 x inteliLIGHT FPX-220 ON/OFF controller. Designed to be used in
controlling decorative lighting, architectural lighting (using lamps up
to 500W) and contactors. A universal device, inteliLIGHT® FPX-220
operates with any lamp or electric device by controlling the power
supply of the connected unit.
- 6990 x inteliLIGHT FPM-152 electromagnetic ballast controller.
Compatible with lamps using electromagnetic ballast up to 150W (both HPS
and HID), it allows ON/OFF and dimming control in addition to full
electrical parameter reading.
- 2850 x inteliLIGHT FPM-402 electromagnetic ballast controller.
Similar functionalities as FPM-152, but compatible with lamps up to
400W.
- 200 x Remote Terminal Unit equipment sets (FPC-200 data
concentrator, FNM-232 electric network analyzer and FRB-110 intelligent
communications router).
- inteliLIGHT streetlight control software
- Dispatch center, integrating all the system functionalities
- City-wide surveillance using Mobotix cameras
- 2N Helios IP Force VOIP panic buttons and BPVOIP communication devices
- EBG Compleo electric vehicle chargers
The financial solution
For this project, in order to support
urban development through the modernization of the street lighting
system and improved public safety in Brasov, the city of Brasov received
an EU grant from the European Regional Development Fund 2007-2013.
The deployment
The dispatch center was the first
functional system segment, as all the other system components needed to
be integrated here. The following steps were lighting control, security
system and EV charging.
Flash Group began the actual field
deployment in March 2014 and it took 16 months until reaching full
system capabilities. Up to 200 controllers were installed daily, with an
installation team of up to 4 installation teams. Since the system is
fully scalable, parts of the system were functional right after the
first RTU installation, and Flash Group could schedule the installation
flow according to the municipality’s priorities during the year.
The system was inaugurated in July 9-th, 2015.
Sistemul a fost inaugurat in iulie a 9-a, 2015.
Inapoi la insemnarea sursa Iluminat inteligent 2
|